Advanced Nuclear Reactors for Data Centers in 2026: Sixteen Developers Scored

A compact reactor building beside a row of data center halls on open ground at dusk

Sixteen advanced fission developers scored on licensing, built hardware, customer deals and published specs. Where TerraPower, Kairos Power, X-energy, GE Vernova Hitachi, Oklo, Valar, Antares, Radiant and others stand in November 2026.

Data centers want firm power, and a new group of fission developers wants to sell it to them. This guide scores sixteen of them on what is published: licensing, built hardware, customer deals and reactor specs.

Why is nuclear back on the data center agenda?

Venture research firm Altis argues that the timing, more than the physics, has changed. In an October 2026 note, Altis's Ben Sun pointed to hyperscalers signing nuclear agreements since 2024, a simpler NRC licensing path, and test reactors moving from construction to criticality in under a year. Altis sizes the US data center nuclear power market at $10 to $30 billion by 2036. That estimate is Altis's own and is not shown on its public pages.

The regulatory change is real. The NRC announced its optional, technology-neutral Part 53 licensing rule on March 25, 2026 (ANS). Separately, the DOE reactor pilot program let developers build and run test reactors under Department of Energy authorization. Antares was first to reach criticality under it, on June 4, 2026, and Valar Atomics second, on June 18 (World Nuclear News).

Altis maps eight fission companies: Aalo, Antares, Apollo Atomics, Last Energy, Oklo, Radiant, TerraPower and Valar Atomics (Altis). We score all of them except Apollo Atomics, an early-stage company without a published licensing step, and add nine more developers that publish licensing, hardware or customer details. This guide describes regulatory status as each company and regulator states it. It is not investment advice.

How do they score?

Four criteria, 1 to 5 each, from company pages, regulator pages and trade press read on November 18 and 19, 2026. These are editorial assessments of published information, not engineering reviews.

  • Licensing: How far the developer has progressed with the NRC or the DOE. An NRC construction permit or design approval scores highest.
  • Hardware: Reactor hardware built and operated. A reactor that has reached criticality scores highest.
  • Offtake: Named customers and power agreements, with megawatts where given.
  • Specs: Reactor type, fuel, coolant and electric output published.
DeveloperLicensingHardwareOfftakeSpecsTotal /20ReactorOutput
TerraPower535518Sodium fast reactor with salt storage (Natrium)345 MWe, 500 MW boost
Kairos Power535316Fluoride salt-cooled reactor (Hermes)Up to 50 MWe (Hermes 2)
X-energy515516Pebble bed high-temperature gas reactor (Xe-100)80 MWe per unit
Aalo Atomics353516Sodium-cooled reactor (Aalo-1, Aalo Pod)10 MWe; 50 MWe per Pod
GE Vernova Hitachi533314Boiling water small modular reactor (BWRX-300)300 MW
NuScale513514Light water small modular reactor (US460)77 MWe per module
Valar Atomics353314Helium-cooled gas reactor (Ward series)Up to 5 MWe intended
Oklo344213Sodium-cooled fast reactor (Aurora)Not stated on product page
Natura Resources531312Molten salt reactor (MSR-1, MSR-100)1 MWt research unit; 100 MW planned
Antares351312Sodium heat pipe microreactor (R1)Not confirmed
Radiant332412Helium-cooled microreactor (Kaleidos)1 MWe
Westinghouse241512Heat pipe microreactor (eVinci)5 MWe
Deep Fission322411Pressurized water reactor in a boreholeAbout 8 to 15 MWe
Holtec311510Pressurized water small modular reactor (SMR-300)About 300 MWe
Last Energy321410Micro modular reactor (PWR-20)20 MWe
NANO Nuclear31138High-temperature gas research reactor (KRONOS)45 MWth research unit

The developers

TerraPower

TerraPower's Natrium plant pairs a sodium-cooled fast reactor with molten salt storage, rated at 345 MWe and able to boost to 500 MW. The NRC issued the construction permit for Kemmerer Unit 1 in Wyoming in March 2026, which the DOE describes as the first NRC construction permit for a commercial non-light-water power reactor (DOE). TerraPower says the first plant is being built (TerraPower). In January 2026 Meta agreed to fund two new Natrium units, up to 690 MW with delivery as early as 2032, and took rights to energy from up to six more, 2.8 GW across eight units (Meta). Best fit: hyperscalers and utilities that need grid-scale output with storage.

Kairos Power

Kairos Power builds fluoride salt-cooled high-temperature reactors and makes its own fuel. It holds NRC construction permits for the Hermes test reactor (December 2023) and for Hermes 2 (November 2024). Hermes 2 pairs two 35 MWt reactors, and its output for TVA is planned to rise from 28 MWe to 50 MWe from a single reactor, with operations scheduled for 2030 (World Nuclear News). TVA has a power purchase agreement for up to 50 MW, and Google, which receives the clean energy attributes, has a 2024 agreement targeting 500 MW by 2035. Kairos has run non-nuclear test units and completed the first phase of its ETU 3 demonstration on September 4, 2026 (Kairos Power). Best fit: hyperscalers willing to contract through a utility.

X-energy

The Xe-100 is a pebble bed high-temperature gas reactor cooled by helium and fuelled with TRISO particles, producing 80 MWe (200 MWt) per unit, with a four-unit plant rated at 320 MW (X-energy Xe-100). The NRC issued a construction permit in November 2026 for Long Mott, four Xe-100 units at Dow's site in Seadrift, Texas (Breakthrough Institute). Dow is the customer named on X-energy's site, and Amazon is backing 5 GW of X-energy projects by 2039, starting with a four-unit, 320 MWe plant with Energy Northwest in Washington (POWER). No built reactor is reported. Best fit: industrial sites and large campuses that need heat as well as power.

Aalo Atomics

Aalo's Aalo-1 is a sodium-cooled reactor using uranium dioxide fuel, rated at 30 MWt and 10 MWe, and its Aalo Pod combines five units for 50 MWe (Aalo Atomics). DOE Idaho approved the Aalo-X safety analysis in May 2026, and Aalo reports that its Aalo-X test reactor in Idaho reached criticality on July 4, 2026. It plans a commercial regulatory application for the Pod in 2027. Aalo partnered with Crusoe in July 2026 and says Aalo-X will power a co-located data center in 2027. Best fit: data center developers who want a site-scale reactor next to their halls.

GE Vernova Hitachi

The BWRX-300 is a 300 MW boiling water small modular reactor. The NRC issued its first US construction permit for the design on September 29, 2026, for TVA's Clinch River site in Tennessee, and in Canada Ontario Power Generation holds a licence to construct at Darlington, where construction is under way (GE Vernova). Blue Energy plans a gas-plus-nuclear plant in Victoria, Texas, where about 1 GW of gas turbines would power a nearby data center it does not name from 2030, and up to five BWRX-300 units would add 1.5 GW from 2032, subject to a 2027 investment decision (GE Vernova). Best fit: utilities and data center developers that want a licensed design at utility scale.

NuScale

NuScale's light water modules produce 77 MWe each, and the US460 plant combines up to six for 462 MWe. The NRC issued the US460 standard design approval in May 2025 (NRC). NuScale has not built a reactor; it signed a manufacturing agreement with Doosan in October 2026, and it names a 6 GW program with TVA and ENTRA1 without a megawatt split (NuScale). NuScale trades on the NYSE as SMR. Best fit: utilities that want an NRC-approved light water design.

Valar Atomics

Valar's Ward 250 is a 100 kWt helium-cooled, TRISO-fuelled test reactor built under DOE authorization. It reached criticality at the Utah San Rafael Energy Lab on June 18, 2026, the second reactor in the DOE pilot program to do so, and the design is intended to scale up to 5 MWe (NEI Magazine). Nvidia announced an exploratory collaboration on a 30 MW AI data center in Orangeville, Utah, on July 1, 2026 (Deseret News). Valar raised a $1 billion Series B led by Sequoia in August 2026 (The Next Web). Commercial sales still need NRC authorization. Best fit: buyers watching for the fastest path from test reactor to product.

Oklo

Oklo's Aurora is a sodium-cooled fast reactor that can run on HALEU or recycled fuel; its product page does not state output per unit (Oklo Aurora). Meta agreed in January 2026 to support development of a 1.2 GW Oklo campus in Pike County, Ohio, including prepayment for power (Orrick). Oklo's Groves isotope test reactor in Texas reached criticality on August 5, 2026, the fifth DOE-authorized reactor to do so (ANS). It is not an Aurora power unit, so hardware scores 4 rather than 5. Oklo is publicly listed. Best fit: hyperscalers that want a large campus and can prepay.

Natura Resources

Natura holds the NRC's first construction permit for a liquid-fuelled advanced reactor, issued in September 2024 for the MSR-1, a 1 MWt molten salt research reactor at Abilene Christian University that produces no electricity (ACU). The company has said the reactor facility is built (Natura Resources), and criticality has not been reported. Its commercial design, the MSR-100, is planned at 100 MW. No customer agreement is named. Best fit: watch list for liquid-fuelled designs.

Antares

Antares was the first developer to reach criticality under the DOE reactor pilot program, with its Mark-0 zero-power test reactor at Idaho National Laboratory on June 4, 2026 (DOE). The Mark-0 is the forerunner of the R1, a sodium heat pipe reactor on TRISO fuel, and its next prototype is the Mark-1, with electricity production the company's stated goal (ANS). Altis reports a $470 million Series C in July 2026. We could not confirm the R1's output or a customer agreement from a page we could read. Best fit: defense and remote sites, as the R1 matures.

Radiant

Radiant's Kaleidos is a 1 MWe, helium-cooled microreactor with TRISO fuel, designed to be transported. It was selected for the DOE DOME test bed at Idaho National Laboratory, the DOE approved its preliminary safety analysis in February 2026, and its first fuel has arrived at the test site (NEI Magazine). In 2025 Radiant signed an agreement with the Defense Innovation Unit and the Air Force toward supplying a microreactor for a military base, as one of several companies made eligible for that program (World Nuclear News). Altis argues Radiant has a stronger team and a better first market through military commitments, with about a third of Valar's capital. Radiant's own site refused our requests, so these facts come from trade press. Best fit: remote and defense sites that need small, movable power.

Westinghouse

Westinghouse's eVinci is a heat pipe microreactor producing 5 MWe from a 15 MWth core on TRISO fuel, with a core life of more than eight years (Westinghouse eVinci). The DOE reported that eVinci reached zero-power criticality in a test at the National Criticality Experiments Research Center in Nevada on September 3, 2026, which counts as built hardware but not a pilot reactor, so hardware scores 4 (DOE). Westinghouse has declined its planned slot in the DOE DOME test bed, its Saskatchewan Research Council project was cancelled in 2025, and we found no NRC licensing action or named eVinci customer (NEI Magazine). Best fit: remote sites that need a few megawatts, once a commercial path is named.

Deep Fission

Deep Fission places a small pressurized water reactor in a borehole about a mile deep, at about 8 MWe for the first unit and about 15 MWe later (Deep Fission). It reports a DOE-approved nuclear safety design agreement in September 2026, a full-scale canister installed and retrieved, and a binding 25-year energy purchase agreement in October 2026 without naming the buyer (deepfission.com). Best fit: buyers interested in a small footprint, once a named customer appears.

Holtec

Holtec plans two SMR-300 pressurized water reactors, about 300 MWe each, at its Palisades site in Michigan, and has filed both parts of its NRC construction permit application (World Nuclear News). No SMR-300 has been built, and no customer for its power is named. Best fit: utilities in the US Midwest, once the application is decided.

Last Energy

Last Energy sells the PWR-20, a 20 MWe micro modular reactor (Last Energy), and is building a smaller pilot reactor at Texas A&M's RELLIS campus under the DOE pilot program. Its safety analysis was cleared in October 2026, so the project can move into readiness review; criticality is not yet authorized (World Nuclear News). It names data centers as a target market but no deals. Best fit: watch list for standardized small units.

NANO Nuclear

NANO Nuclear Energy, listed on Nasdaq as NNE, has applied to the NRC for a construction permit for a KRONOS high-temperature gas research reactor at the University of Illinois. The NRC lists it as a 45 MWth reactor, docketed the application in May 2026 and plans its final safety evaluation for September 2027 (NRC). The company page names no customer (NANO Nuclear). Best fit: watch list.

Not scored: Apollo Atomics, which Altis maps, an early-stage company whose headline product is a compact steam generator and which has no licensing step or named customer we could confirm, and Terrestrial Energy, which we have not yet scored from its own filings.

How should data center buyers read this market?

  1. Separate test reactors from power plants. Criticality on a 100 kWt test unit is a milestone, not a megawatt you can buy. Ask when the commercial unit is licensed and when it delivers power.
  2. Ask which regulator. DOE authorization covers testing. Selling power needs the NRC, and the timeline depends on which path the developer uses.
  3. Read the deal terms. Exploratory collaborations, master agreements and prepaid power purchase agreements carry very different obligations.
  4. Check the fuel. Several designs need HALEU or TRISO fuel, which is in short supply. Ask who supplies it and when.
  5. Plan a bridge. The earliest data center deliveries named here are 2027 and later. Plan power for the years in between.

Sources

Can a data center buy nuclear power from an advanced reactor today?

Not yet from a commercial advanced reactor. As of November 2026 the developers here have construction permits, design approvals, test reactors or signed agreements, but none sells power from a commercial unit. Kairos Power's first plant for TVA is scheduled for 2030, and Aalo says its Aalo-X reactor is to power a co-located data center in 2027.

Which advanced nuclear developer scores highest?

On our four criteria TerraPower scores highest (18/20), followed by Kairos Power, X-energy and Aalo Atomics (16), GE Vernova Hitachi, NuScale and Valar Atomics (14), Oklo (13), Natura Resources, Antares, Radiant and Westinghouse (12), Deep Fission (11), Holtec and Last Energy (10) and NANO Nuclear (8). The criteria reward published licensing, hardware, deals and specs. They are not an engineering review or investment advice.

What is the difference between NRC licensing and the DOE reactor pilot program?

The DOE pilot program lets developers build and run test reactors under Department of Energy authorization, which is how Valar and others reached criticality quickly in 2026. Selling power commercially still needs Nuclear Regulatory Commission approval. The NRC's Part 53 rule, announced March 25, 2026, adds a technology-neutral licensing path.

Which tech companies have signed advanced nuclear deals?

In January 2026 Meta announced agreements with TerraPower, for up to eight Natrium units and 2.8 GW, and with Oklo, for a 1.2 GW campus in Ohio. Amazon is backing 5 GW of X-energy projects by 2039. Google has a 2024 agreement with Kairos Power targeting 500 MW by 2035. Nvidia announced an exploratory 30 MW AI data center collaboration with Valar Atomics in Utah in July 2026, and Crusoe partnered with Aalo Atomics.